|
Product Detail :
|
Through Sleeper Replacement (TSR) in Verna Tunnel, Km 426/684 to 427/489
(total 1205 metre), including 200 metre approach on both sides of the tunnel,
under SSE/P.Way/MAO section Phase-I
|
| Tender Detail : |
Through Sleeper Replacement (TSR) in Verna Tunnel, Km 426/684 to 427/489
(total 1205 metre), including 200 metre approach on both sides of the tunnel,
under SSE/P.Way/MAO section Phase-I |